Sources
Source numbers link the text to the records below. I draw on official staff reports, minutes, presentations, recordings, and City-hosted captions. The entries identify the source of quoted wording and any manual recording checks. A check of speaker identity or timing is identified separately from a check of the quoted words. Official agendas, minutes, reports, and later project records also help establish speaker identities and context. Timestamps locate approximately where a passage begins. Accounts based on written records are summaries.
The available record has gaps. The records reviewed do not provide a complete annual death count through 2026. Recordings were unavailable for review for the Public Safety Committee meetings of July 19, 2017, April 18, 2018, April 17 and May 15, 2019, and February 3, 2020. The accounts of those meetings rely on official minutes and other written City records, including materials obtained through public-records requests. For the February 2020 meeting, the City Clerk’s Department reported that it did not have a recording. Sources 2, 3, 6, 8, and 10 identify the supporting records and explain the remaining limits.
Copies of the committee minutes cited in Sources 2, 6, 8, and 10 and the February 2020 agenda packet are available in the preserved City records index. These are preserved copies of official City records.
1. National Park Service, National Register of Historic Places, Colorado Street Bridge, NRIS 81000156, listed February 12, 1981. Library of Congress, Historic American Engineering Record No. CA-58, Colorado Street Bridge, records its 1913 construction. GPA Consulting, Historical Resource Technical Report, draft, November 2019, printed p. 2 (PDF p. 5), also documents the bridge’s national, state, and City landmark status.
Return to passage ↑Passages citing this source
- Section 1 · The bridge and its history · reference 1
- Section 1 · The bridge and its history · reference 2
- Section 11 · Not every delay is the same
- One page · Section 1 · The bridge and its history · reference 1
- One page · Section 1 · The bridge and its history · reference 2
- One page · Section 11 · Not every delay is the same
2. City of Pasadena Public Safety Committee presentation and official minutes, July 19, 2017. The presentation said the bridge began to “earn” its nickname during the Great Depression, reported more than 150 deaths by suicide at the bridge since 1919, including an estimated 79 during the 1930s, showed City fencing and netting drawings from approximately 1932, reported that a police detail at the bridge during the 1930s cost $20,000 a year, and counted 28 deaths during 2006 through 2016. Slide 10 identifies wrought-iron fencing installed during the seismic retrofit in the early 1990s. The same presentation described the existing barrier and railing as nearly eight feet high, but identified all 20 alcoves and the bridge ends as places where people could climb over or get around them. The minutes, p. 3, record Tornek’s support for emergency fencing at the alcoves, his recommendation to continue fencing along the ends and approaches, his request that staff engage local architects and engineers on an effective, cost-effective, and aesthetically pleasing response, and Kennedy’s support for alcove fencing on an emergency basis and his view that it would provide time to find a more permanent solution. The minutes also record Hampton supporting planting trees under the bridge, as several public speakers had suggested, continued fencing along the ends and approaches, surveillance cameras, and citizen police patrols. Madison was absent. Slides 23 and 25 discuss interrupted attempts, the possibility of an acute crisis passing, and the evidence against inevitable displacement to another location. PDF pp. 11–12 report an increase in incidents, including suicides and attempts.
Return to passage ↑Passages citing this source
- Section 1 · The bridge and its history
- Section 2 · 2017–2018. An emergency response to an old problem · reference 1
- Section 2 · 2017–2018. An emergency response to an old problem · reference 2
- Section 2 · 2017–2018. An emergency response to an old problem · reference 3
- Section 2 · 2017–2018. An emergency response to an old problem · reference 4
- Section 2 · 2017–2018. An emergency response to an old problem · reference 5
- Section 2 · 2017–2018. An emergency response to an old problem · reference 6
- Section 2 · 2017–2018. An emergency response to an old problem · reference 7
- Section 2 · 2017–2018. An emergency response to an old problem · reference 8
- Section 2 · 2017–2018. An emergency response to an old problem · reference 9
- Section 4 · 2021. Selection is deferred
- One page · Section 1 · The bridge and its history
- One page · Section 2 · 2017–2018. An emergency response to an old problem · reference 1
- One page · Section 2 · 2017–2018. An emergency response to an old problem · reference 2
- One page · Section 2 · 2017–2018. An emergency response to an old problem · reference 3
- One page · Section 2 · 2017–2018. An emergency response to an old problem · reference 4
- One page · Section 2 · 2017–2018. An emergency response to an old problem · reference 5
- One page · Section 2 · 2017–2018. An emergency response to an old problem · reference 6
- One page · Section 2 · 2017–2018. An emergency response to an old problem · reference 7
- One page · Section 2 · 2017–2018. An emergency response to an old problem · reference 8
- One page · Section 2 · 2017–2018. An emergency response to an old problem · reference 9
- One page · Section 4 · 2021. Selection is deferred
3. Pasadena Public Safety Committee staff report, August 18, 2021, p. 2. The Police Department tables cover January 1, 2015 through June 13, 2021. The suicide table lists ten deaths in 2017, four in 2018, one in 2019, none in 2020, and one in the partial 2021 period. Pasadena Now, “Pasadena to Install Emergency Fencing Along Entire Length of Colorado Street Bridge to Prevent Suicides,” September 4, 2018, quoted then-City Manager Steve Mermell as saying nine in 2017. This paper uses the Police Department table as the controlling count. The difference remains unexplained. At the November 15, 2023 committee meeting, Police Department Lieutenant Brad May introduces himself at approximately 00:25:14 and reports four deaths in 2022 and two so far in 2023 beginning at 00:25:22. In the exchange that follows, he distinguishes deaths from attempts. Tony Olmos repeats the figures and specifies that they concern the bridge at 00:56:12. I checked these passages and timestamps against the official recording after checking the City-hosted captions and a transcript of the recording. The oral updates cover the periods stated. A complete bridge-death series for 2024–2026 remains unavailable.
Return to passage ↑Passages citing this source
- Section 2 · 2017–2018. An emergency response to an old problem · reference 1
- Section 2 · 2017–2018. An emergency response to an old problem · reference 2
- Section 2 · 2017–2018. An emergency response to an old problem · reference 3
- Section 4 · 2021. Selection is deferred
- Section 12 · Where that leaves Pasadena · reference 1
- Section 12 · Where that leaves Pasadena · reference 2
- Section 12 · Where that leaves Pasadena · reference 3
- One page · Section 2 · 2017–2018. An emergency response to an old problem · reference 1
- One page · Section 2 · 2017–2018. An emergency response to an old problem · reference 2
- One page · Section 2 · 2017–2018. An emergency response to an old problem · reference 3
- One page · Section 4 · 2021. Selection is deferred
- One page · Section 12 · Where that leaves Pasadena · reference 1
- One page · Section 12 · Where that leaves Pasadena · reference 2
- One page · Section 12 · Where that leaves Pasadena · reference 3
4. Pasadena Public Safety Committee staff report, September 21, 2022, Colorado Street Bridge Barrier Enhancements Project Update. The report recounts the September 2, 2018 thirteen-hour intervention and emergency full-span fencing, traces the Donald MacDonald Architects design process, records the February 3, 2020 Public Safety Committee review, dates the full-scale mockup installation to March 2021, describes the post-2021 design reset, and lays out the next consultant-procurement and design schedule. Official September 21, 2022 meeting recording.
Return to passage ↑Passages citing this source
- Section 2 · 2017–2018. An emergency response to an old problem · reference 1
- Section 2 · 2017–2018. An emergency response to an old problem · reference 2
- Section 2 · 2017–2018. An emergency response to an old problem · reference 3
- Section 2 · 2017–2018. An emergency response to an old problem · reference 4
- Section 4 · 2021. Selection is deferred
- Section 5 · 2022. The first design cycle resets · reference 1
- Section 5 · 2022. The first design cycle resets · reference 2
- Section 9 · 2025–2026. The schedule moves again
- Section 10 · How the forecasts changed · reference 1
- Section 10 · How the forecasts changed · reference 2
- Section 12 · Where that leaves Pasadena
- One page · Section 2 · 2017–2018. An emergency response to an old problem · reference 1
- One page · Section 2 · 2017–2018. An emergency response to an old problem · reference 2
- One page · Section 2 · 2017–2018. An emergency response to an old problem · reference 3
- One page · Section 2 · 2017–2018. An emergency response to an old problem · reference 4
- One page · Section 4 · 2021. Selection is deferred
- One page · Section 5 · 2022. The first design cycle resets · reference 1
- One page · Section 5 · 2022. The first design cycle resets · reference 2
- One page · Section 9 · 2025–2026. The schedule moves again
- One page · Section 10 · How the forecasts changed · reference 1
- One page · Section 10 · How the forecasts changed · reference 2
- One page · Section 12 · Where that leaves Pasadena
5. City of Pasadena, Colorado Bridge Safety presentation, April 18, 2018, PDF pp. 2–3, 8, 18, 24, and 29–32, and Colorado Bridge Task Force Recommendation agenda report, April 23, 2018, pp. 1–3. Page 3 contains the report’s “cushion” and “no verifying scientific data was found” wording, the approximately 20% planting restriction, and the supplemental-measure qualification. Documents the multidisciplinary participation of City health and public-health leadership, Didi Hirsch Mental Health Services, Police, Fire, design and engineering professionals, and preservation advocates, together with the alternatives matrix distinguishing primary physical means restriction from complementary measures. The City’s July 2017 presentation (pp. 20–21) and April 2018 presentation (p. 38) cite A. Hemmer, P. Meier, and T. Reisch, “Comparing Different Suicide Prevention Measures at Bridges and Buildings: Lessons We Have Learned from a National Survey in Switzerland,” PLOS ONE 12, no. 1, 2017, e0169625. The study’s complete-measure category included both vertical barriers and nets. It did not establish that one type was more effective than the other. Pasadena’s recommendation also reflected its local assessment of preservation and emergency-services concerns.
Return to passage ↑Passages citing this source
- Section 2 · 2017–2018. An emergency response to an old problem · reference 1
- Section 2 · 2017–2018. An emergency response to an old problem · reference 2
- Section 2 · 2017–2018. An emergency response to an old problem · reference 3
- Section 2 · 2017–2018. An emergency response to an old problem · reference 4
- Section 2 · 2017–2018. An emergency response to an old problem · reference 5
- Section 3 · 2018–2019. Pasadena chooses a policy direction
- Section 6 · 2023. Previously considered alternatives return
- Section 7 · 2024. The requested answers come back
- Section 8 · Questions that returned · reference 1
- Section 8 · Questions that returned · reference 2
- Section 8 · Questions that returned · reference 3
- One page · Section 2 · 2017–2018. An emergency response to an old problem · reference 1
- One page · Section 2 · 2017–2018. An emergency response to an old problem · reference 2
- One page · Section 2 · 2017–2018. An emergency response to an old problem · reference 3
- One page · Section 2 · 2017–2018. An emergency response to an old problem · reference 4
- One page · Section 2 · 2017–2018. An emergency response to an old problem · reference 5
- One page · Section 3 · 2018–2019. Pasadena chooses a policy direction
- One page · Section 6 · 2023. Previously considered alternatives return
- One page · Section 7 · 2024. The requested answers come back
- One page · Section 8 · Questions that returned · reference 1
- One page · Section 8 · Questions that returned · reference 2
- One page · Section 8 · Questions that returned · reference 3
6. City of Pasadena Public Safety Committee official minutes, April 18, 2018, p. 2, the April 23, 2018 task-force recommendation report, p. 3, and City Council meeting, April 23, 2018, official minutes (p. 5), official agenda, and official meeting recording. The task-force report specified a minimum vertical-barrier height of 7 feet 6 inches “above highest toe-hold.” The body uses “foothold” for clarity. The April 18 minutes record Madison’s support for moving forward and his request for dimensions or a visual, Tornek’s request for a visual showing the scale of the proposed 7-foot-6-inch barriers, and the committee’s unanimous referral. On April 23, Agenda Item 8 was “Approval of Colorado Bridge Task Force Recommendation to Deter Suicide Attempts on the Colorado Street Bridge.” The official Council minutes record Hampton’s request that staff consider temporary fencing at the bridge’s ends and approaches until an approved fence design could be constructed, and record that Madison moved to approve the staff recommendation, Hampton seconded, and the motion carried unanimously. The motion-and-approval sequence begins at approximately 01:39:51. For later design context, the City project FAQ, checked October 5, 2026, describes 8–11 feet above the nearest toehold and presented options at 10 feet above it. That later webpage wording does not establish a formal revision of the 2018 criterion.
Return to passage ↑Passages citing this source
- Section 3 · 2018–2019. Pasadena chooses a policy direction · reference 1
- Section 3 · 2018–2019. Pasadena chooses a policy direction · reference 2
- Section 3 · 2018–2019. Pasadena chooses a policy direction · reference 3
- Section 3 · 2018–2019. Pasadena chooses a policy direction · reference 4
- Section 6 · 2023. Previously considered alternatives return
- Section 7 · 2024. The requested answers come back
- Section 11 · Not every delay is the same · reference 1
- Section 11 · Not every delay is the same · reference 2
- Section 11 · Not every delay is the same · reference 3
- One page · Section 3 · 2018–2019. Pasadena chooses a policy direction · reference 1
- One page · Section 3 · 2018–2019. Pasadena chooses a policy direction · reference 2
- One page · Section 3 · 2018–2019. Pasadena chooses a policy direction · reference 3
- One page · Section 3 · 2018–2019. Pasadena chooses a policy direction · reference 4
- One page · Section 6 · 2023. Previously considered alternatives return
- One page · Section 7 · 2024. The requested answers come back
- One page · Section 11 · Not every delay is the same · reference 1
- One page · Section 11 · Not every delay is the same · reference 2
- One page · Section 11 · Not every delay is the same · reference 3
7. City of Pasadena, City Council meeting, April 23, 2018, official meeting recording, Agenda Item 8. The bridge item begins at 00:52:35. Public Works begins reviewing the recommendations at 01:01:16. Staff identifies portions covering about 20 percent of the bridge where trees could not be planted at 01:04:17. The lead-in to the discussion of a suggestion for hedges spelling “HOPE” is at approximately 01:04:54, a locator checked manually. Masuda’s pedestrian-closure question begins at 01:14:36. McAustin’s consultant-scope question begins at 01:20:21, and Maloyan’s answer begins at 01:20:58. McAustin asks whether the consultant will provide a range of options at 01:22:55, and Maloyan answers at 01:23:11 that several options will return to the community for review. Wilson’s substitution discussion begins at 01:24:11. Mermell joins it at 01:25:58, Wilson calls on Public Health at 01:26:46, and Michael Johnson begins answering at 01:27:14. Gordo’s regional-effect follow-up begins at 01:31:15. Johnson answers at 01:31:51, Gordo asks about the study at 01:32:08, and Johnson resumes at 01:32:15. Tornek’s consensus warning begins at 01:36:06. Wilson’s 7-foot-6-inch barrier question follows. Tornek’s “harbinger” remark begins at 01:39:13.
Return to passage ↑Passages citing this source
- Section 2 · 2017–2018. An emergency response to an old problem · reference 1
- Section 2 · 2017–2018. An emergency response to an old problem · reference 2
- Section 3 · 2018–2019. Pasadena chooses a policy direction · reference 1
- Section 3 · 2018–2019. Pasadena chooses a policy direction · reference 2
- Section 3 · 2018–2019. Pasadena chooses a policy direction · reference 3
- Section 3 · 2018–2019. Pasadena chooses a policy direction · reference 4
- Section 3 · 2018–2019. Pasadena chooses a policy direction · reference 5
- Section 4 · 2021. Selection is deferred
- Section 6 · 2023. Previously considered alternatives return
- Section 8 · Questions that returned
- Section 11 · Not every delay is the same
- One page · Section 2 · 2017–2018. An emergency response to an old problem · reference 1
- One page · Section 2 · 2017–2018. An emergency response to an old problem · reference 2
- One page · Section 3 · 2018–2019. Pasadena chooses a policy direction · reference 1
- One page · Section 3 · 2018–2019. Pasadena chooses a policy direction · reference 2
- One page · Section 3 · 2018–2019. Pasadena chooses a policy direction · reference 3
- One page · Section 3 · 2018–2019. Pasadena chooses a policy direction · reference 4
- One page · Section 3 · 2018–2019. Pasadena chooses a policy direction · reference 5
- One page · Section 4 · 2021. Selection is deferred
- One page · Section 6 · 2023. Previously considered alternatives return
- One page · Section 8 · Questions that returned
- One page · Section 11 · Not every delay is the same
8. City Council records, May 7, 2018, approving $400,000 for environmental and design work on the bridge project. See the staff report, p. 2, Exhibit B, p. 1, and approved minutes, pp. 7–9. Public Safety Committee official minutes, April 17, 2019, pp. 2–3, and May 15, 2019, pp. 2–3. The May 20, 2019 City Council agenda report and official recording. The May 20 report, p. 2, dates the request for proposals to October 17, 2018, receipt of two responsive proposals to January 24, 2019, and interviews with both firms to February 21, 2019. The April 17 minutes record Tornek’s urgency concerns and Madison’s caution about rushing work on a historic landmark, together with his support for a revised schedule, budget review, and grant search. The May 15 minutes record Madison’s motion, Tornek’s second, and unanimous approval of the revised recommendation. In the May 20 recording (clip 4580), Item 7 begins at 00:46:52. The written report documents a ten-month reduction in the design schedule and a $200,000 reduction in the proposed consultant contract from $700,000 to $500,000.
Return to passage ↑Passages citing this source
- Section 3 · 2018–2019. Pasadena chooses a policy direction · reference 1
- Section 3 · 2018–2019. Pasadena chooses a policy direction · reference 2
- Section 3 · 2018–2019. Pasadena chooses a policy direction · reference 3
- Section 3 · 2018–2019. Pasadena chooses a policy direction · reference 4
- Section 5 · 2022. The first design cycle resets
- Section 10 · How the forecasts changed
- Section 11 · Not every delay is the same
- One page · Section 3 · 2018–2019. Pasadena chooses a policy direction · reference 1
- One page · Section 3 · 2018–2019. Pasadena chooses a policy direction · reference 2
- One page · Section 3 · 2018–2019. Pasadena chooses a policy direction · reference 3
- One page · Section 3 · 2018–2019. Pasadena chooses a policy direction · reference 4
- One page · Section 5 · 2022. The first design cycle resets
- One page · Section 10 · How the forecasts changed
- One page · Section 11 · Not every delay is the same
9. City of Pasadena 2021 design-review and Public Safety Committee records, including the April 20, 2021 Historic Preservation Commission memo and minutes, the May 11, 2021 Design Commission memo, and the August 18, 2021 Public Safety Committee staff report, minutes, advisory-body materials, and project chronology. The April memo identifies the full-scale mockups as Option A – Mesh (Curved-Straight), Option B – Mesh (Curved-Curved), and Option C – Picket (Straight-Straight). The April minutes, p. 2, record the motion to pursue Option B with modifications. The May memo, p. 2, reports that Historic Preservation Commission vote. Pages 5 and 7 distinguish Option A, with curved barriers at the lamp posts and alcoves and straight sections elsewhere, from Option B, with a curved barrier along the entire bridge. The illustrations on pp. 5–8 show the curved mesh turning inward over the walkway. The August report, p. 3, separately summarizes the Design Commission’s preference for straight mesh panels between the alcoves and further study to improve transparency around the alcoves and light poles. This was advisory feedback, not approval of a finished Option A design. Page 5 asks whether to recommend Option A or B, retain the temporary fence for the time being, or take another course. City records differ on when the task force began. The April 23, 2018 staff report, p. 1, and February 22, 2023 presentation, p. 4, give August 2017. The April 20, 2021 presentation, pp. 4–5, gives October 2017. The August report, PDF p. 3, gives the 2021 survey’s overall response count, ranking subset, option counts, and separate comment coding. These are not directly comparable with the later survey’s yes-or-no need question. The fiscal section, PDF p. 5, says $1.05 million had been appropriated and spent on temporary fencing and maintenance, mockups, environmental assessment, conceptual design, and outreach. Its $4–6 million completion estimate covered both design and construction.
Return to passage ↑Passages citing this source
- Section 2 · 2017–2018. An emergency response to an old problem
- Section 4 · 2021. Selection is deferred · reference 1
- Section 4 · 2021. Selection is deferred · reference 2
- Section 4 · 2021. Selection is deferred · reference 3
- Section 4 · 2021. Selection is deferred · reference 4
- Section 4 · 2021. Selection is deferred · reference 5
- Section 4 · 2021. Selection is deferred · reference 6
- Section 4 · 2021. Selection is deferred · reference 7
- Section 4 · 2021. Selection is deferred · reference 8
- Section 5 · 2022. The first design cycle resets
- Section 9 · 2025–2026. The schedule moves again
- Section 10 · How the forecasts changed · reference 1
- Section 10 · How the forecasts changed · reference 2
- One page · Section 2 · 2017–2018. An emergency response to an old problem
- One page · Section 4 · 2021. Selection is deferred · reference 1
- One page · Section 4 · 2021. Selection is deferred · reference 2
- One page · Section 4 · 2021. Selection is deferred · reference 3
- One page · Section 4 · 2021. Selection is deferred · reference 4
- One page · Section 4 · 2021. Selection is deferred · reference 5
- One page · Section 4 · 2021. Selection is deferred · reference 6
- One page · Section 4 · 2021. Selection is deferred · reference 7
- One page · Section 4 · 2021. Selection is deferred · reference 8
- One page · Section 5 · 2022. The first design cycle resets
- One page · Section 9 · 2025–2026. The schedule moves again
- One page · Section 10 · How the forecasts changed · reference 1
- One page · Section 10 · How the forecasts changed · reference 2
10. Pasadena Public Safety Committee agenda packet and minutes, February 3, 2020, and presentation, February 3, 2020. The February 3, 2020 presentation separates the task force’s recommended minimum height from the consultant’s broader design criteria. Those criteria included height, resistance to climbing, historic preservation, appearance, and emergency access. Slides 10–27 show the design options and their different dimensions.
Slide 30 ranks curved mesh highest among the options shown, but it does not identify the final mesh type.
Slide 31 gives the projected schedule for March through May. Kennedy’s request for a roof over the barrier appears in the meeting minutes on page 2. Page 3 records the committee’s action as receiving and filing the information.
The August 2021 report documents the later review of a preliminary enclosure concept with task-force participants, including Pasadena Heritage and police and fire representatives, and states that it was not considered acceptable on aesthetic or safety grounds.
In its September 9, 2026 response to PRA 0046900, the City Clerk’s Department supplied the February 2020 agenda packet and minutes and reported that it did not have a recording of the meeting. Public Works subsequently supplied links to written meeting records, but no recording. The account summarizes these written City records.
Return to passage ↑Passages citing this source
- Section 4 · 2021. Selection is deferred · reference 1
- Section 4 · 2021. Selection is deferred · reference 2
- Section 10 · How the forecasts changed
- One page · Section 4 · 2021. Selection is deferred · reference 1
- One page · Section 4 · 2021. Selection is deferred · reference 2
- One page · Section 10 · How the forecasts changed
11. City of Pasadena Public Safety Committee, August 18, 2021, official meeting recording. The bridge item begins at 00:04:39. Mermell first says “get it right” at 00:07:39. Markarian’s pandemic-related procurement and mockup-fabrication explanation begins at 00:14:14. Steve Line’s design-criteria passage begins at 00:48:33. Madison introduces Gladwell at 01:03:49, begins discussing coupling at 01:04:08, and says the temporary solution is not elegant but has been effective at 01:08:59. Kennedy’s “one last time out” passage begins at 01:16:41, and he characterizes Madison’s proposal as “getting it right” at 01:16:54. Gordo begins his coupling discussion at 01:19:48, says the temporary fence has begun to decouple the bridge from suicide at 01:20:58, and says “the decoupling, if you will, has started” at 01:21:22. He says the committee is not ready to narrow the options at 01:21:36, says “get it right” at 01:21:55 and 01:22:20, returns to additional options at 01:22:23, and uses the phrase again at 01:23:41. Hampton says “get this right” at 01:26:03 and proposes 24-hour staffing at 01:26:44. Mermell answers at 01:27:11. Hampton returns to “get it right” at 01:29:30 and 01:31:50. Gordo’s Host/Guide discussion begins at 01:31:59, including the ROSE idea at approximately 01:34:19. Madison’s practical staffing concerns begin at 01:36:11. Kennedy’s liability and intervention discussion begins at 01:39:01, and he says to go out again and “get it right” at 01:41:11. Mermell’s closing summary begins at 01:43:48. Gordo’s hybrid proposal begins at 01:45:08. For the program’s youth-employment purpose, see the City’s 2026 ROSE Internship Program announcement, February 4, 2026. The proposed bridge role was an idea under discussion, not an established ROSE assignment.
Return to passage ↑Passages citing this source
- Section 4 · 2021. Selection is deferred · reference 1
- Section 4 · 2021. Selection is deferred · reference 2
- Section 4 · 2021. Selection is deferred · reference 3
- Section 4 · 2021. Selection is deferred · reference 4
- Section 4 · 2021. Selection is deferred · reference 5
- Section 4 · 2021. Selection is deferred · reference 6
- Section 4 · 2021. Selection is deferred · reference 7
- Section 4 · 2021. Selection is deferred · reference 8
- Section 4 · 2021. Selection is deferred · reference 9
- Section 4 · 2021. Selection is deferred · reference 10
- Section 4 · 2021. Selection is deferred · reference 11
- Section 11 · Not every delay is the same
- One page · Section 4 · 2021. Selection is deferred · reference 1
- One page · Section 4 · 2021. Selection is deferred · reference 2
- One page · Section 4 · 2021. Selection is deferred · reference 3
- One page · Section 4 · 2021. Selection is deferred · reference 4
- One page · Section 4 · 2021. Selection is deferred · reference 5
- One page · Section 4 · 2021. Selection is deferred · reference 6
- One page · Section 4 · 2021. Selection is deferred · reference 7
- One page · Section 4 · 2021. Selection is deferred · reference 8
- One page · Section 4 · 2021. Selection is deferred · reference 9
- One page · Section 4 · 2021. Selection is deferred · reference 10
- One page · Section 4 · 2021. Selection is deferred · reference 11
- One page · Section 11 · Not every delay is the same
12. City of Pasadena records concerning Councilmember John J. Kennedy and the District 3 succession. The City’s July 21, 2022 statement says Kennedy had served District 3 since 2013. City Council Resolution No. 9928, adopted July 11, 2022, certifying the June 7 election declared Kennedy re-elected to a new four-year District 3 term. The City’s September 29, 2022 special-meeting action recap, Item 3, documents the Council’s appointment of Justin Jones to fill the District 3 vacancy, with later City records documenting his continuation in the seat. The City’s 2022 Annual Report, PDF p. 2, records that Kennedy died while serving in office on July 21, 2022. The City’s December 9, 2024 organizational-meeting minutes, pp. 1–2, record Jones winning the March 5, 2024 special election to fill the remaining two years of the District 3 term.
Return to passage ↑13. City of Pasadena Department of Public Works project records and “Colorado Street Bridge Barrier Enhancements Project Update,” presentation to the Public Safety Committee, November 15, 2023, PDF pp. 14–15, 18, and 28. The City project page records the Apexx Architecture design-contract award on April 14, 2023. The 2023 design process produced three new preliminary vertical-barrier concepts presented to the Public Safety Committee in November 2023, canted webmesh, vertical webmesh, and metal pickets. The presentation illustrates the mesh and picket materials and the angled and upright webmesh designs described in the body.
Return to passage ↑14. City of Pasadena Public Safety Committee, November 15, 2023, official meeting recording. Supports Madison’s discussion of impulsivity and survivor outcomes, Jones’s Public Health and substitution questions, Public Works’ response, and the discussion of netting, landscaping, community response, and previously studied alternatives. Madison’s crisis-specific impulsivity and survivor-account passage begins at approximately 00:26:01. His aesthetic and human-safety discussion begins at approximately 00:29:07, and his trees-and-shrubs question at approximately 00:33:24. Jones begins the Public Health exchange at 00:56:47. Tony Olmos answers at 00:57:36, Jones resumes at 00:58:27, Madison speaks at 01:00:35, and Olmos resumes at 01:00:41. Kris Markarian says “Yes, it buys time” at 01:01:26 and continues at 01:01:27 that it also buys time for notified first responders to arrive. Madison begins saying Public Health should be involved at 01:01:34. These speaker handoffs and times were manually checked against the official recording. The November 2023 presentation, p. 34, schedules further reviews and a questionnaire before a later recommendation. Tony Olmos asks whether staff should continue or pause at approximately 00:54:37. Jones recommends proceeding with commission review and a survey at 00:55:35. At 01:02:09, Olmos proposes continuing the planned meetings and returning with survey results, responses, and Public Health and other expert input. The speakers and times in these final three passages were manually checked against the official recording.
Return to passage ↑Passages citing this source
- Section 2 · 2017–2018. An emergency response to an old problem
- Section 6 · 2023. Previously considered alternatives return · reference 1
- Section 6 · 2023. Previously considered alternatives return · reference 2
- Section 6 · 2023. Previously considered alternatives return · reference 3
- Section 6 · 2023. Previously considered alternatives return · reference 4
- Section 6 · 2023. Previously considered alternatives return · reference 5
- Section 6 · 2023. Previously considered alternatives return · reference 6
- Section 6 · 2023. Previously considered alternatives return · reference 7
- Section 6 · 2023. Previously considered alternatives return · reference 8
- Section 6 · 2023. Previously considered alternatives return · reference 9
- Section 8 · Questions that returned · reference 1
- Section 8 · Questions that returned · reference 2
- Section 8 · Questions that returned · reference 3
- Section 10 · How the forecasts changed
- Section 11 · Not every delay is the same · reference 1
- Section 11 · Not every delay is the same · reference 2
- Section 12 · Where that leaves Pasadena
- One page · Section 2 · 2017–2018. An emergency response to an old problem
- One page · Section 6 · 2023. Previously considered alternatives return · reference 1
- One page · Section 6 · 2023. Previously considered alternatives return · reference 2
- One page · Section 6 · 2023. Previously considered alternatives return · reference 3
- One page · Section 6 · 2023. Previously considered alternatives return · reference 4
- One page · Section 6 · 2023. Previously considered alternatives return · reference 5
- One page · Section 6 · 2023. Previously considered alternatives return · reference 6
- One page · Section 6 · 2023. Previously considered alternatives return · reference 7
- One page · Section 6 · 2023. Previously considered alternatives return · reference 8
- One page · Section 6 · 2023. Previously considered alternatives return · reference 9
- One page · Section 8 · Questions that returned · reference 1
- One page · Section 8 · Questions that returned · reference 2
- One page · Section 8 · Questions that returned · reference 3
- One page · Section 10 · How the forecasts changed
- One page · Section 11 · Not every delay is the same · reference 1
- One page · Section 11 · Not every delay is the same · reference 2
- One page · Section 12 · Where that leaves Pasadena
15. City of Pasadena Public Safety Committee official meeting recordings, August 18, 2021, and November 15, 2023. The November 2023 staffing exchange involves Mayor Victor Gordo, Deputy Director of Public Works and City Engineer Kris Markarian, and Councilmember Steve Madison. Markarian’s cost, coverage, liability, off-hours, and complementary-measure response begins at 00:47:01. Gordo’s “a couple hundred thousand dollars” and “money well spent” passage begins at 00:51:52. Madison takes over at 00:52:29 and says “five, six, eight million dollars” at 00:52:36. His five-minute and practical-effectiveness discussion follows. Gordo resumes at 00:53:38 and asks staff to consult psychologists and psychiatrists about deterrence. These speaker handoffs and times were checked manually against the official video.
Return to passage ↑Passages citing this source
- Section 6 · 2023. Previously considered alternatives return · reference 1
- Section 6 · 2023. Previously considered alternatives return · reference 2
- Section 6 · 2023. Previously considered alternatives return · reference 3
- Section 8 · Questions that returned
- Section 11 · Not every delay is the same · reference 1
- Section 11 · Not every delay is the same · reference 2
- One page · Section 6 · 2023. Previously considered alternatives return · reference 1
- One page · Section 6 · 2023. Previously considered alternatives return · reference 2
- One page · Section 6 · 2023. Previously considered alternatives return · reference 3
- One page · Section 8 · Questions that returned
- One page · Section 11 · Not every delay is the same · reference 1
- One page · Section 11 · Not every delay is the same · reference 2
16. City of Pasadena, Colorado Street Bridge Barrier Enhancements Project Update, Public Safety Committee presentation, July 17, 2024, 51 PDF pages, and accompanying staff report, p. 7 (agenda packet p. 24). The presentation shows the two remaining staff design options, vertical webmesh and metal pickets, and includes patrol-cost estimates, horizontal-netting analysis, Golden Gate consultation, survey results, rescue considerations, and suicide-prevention expertise. The engineering review was still preliminary when staff recommended against netting. Connections to the bridge had not been designed, and further study was needed to determine whether the bridge would require structural changes. The preliminary structural assessment appears on presentation p. 37, and the recommendation against netting on p. 48. The unfinished structural work is also described in the City-hosted captions at approximately 00:27:24–00:27:57. This passage was manually checked against the official recording. The Historic Preservation Commission’s December 5, 2023 minutes, p. 2, record vertical webmesh and metal pickets as the commission’s first and second choices. Presentation p. 16 reports those choices and lists canted webmesh as eliminated. The January 2024 Design Commission requested further study, as recorded in Source 33.
Return to passage ↑Passages citing this source
- Section 6 · 2023. Previously considered alternatives return
- Section 7 · 2024. The requested answers come back · reference 1
- Section 7 · 2024. The requested answers come back · reference 2
- Section 7 · 2024. The requested answers come back · reference 3
- Section 8 · Questions that returned · reference 1
- Section 8 · Questions that returned · reference 2
- Section 11 · Not every delay is the same · reference 1
- Section 11 · Not every delay is the same · reference 2
- Section 11 · Not every delay is the same · reference 3
- Section 12 · Where that leaves Pasadena
- One page · Section 6 · 2023. Previously considered alternatives return
- One page · Section 7 · 2024. The requested answers come back · reference 1
- One page · Section 7 · 2024. The requested answers come back · reference 2
- One page · Section 7 · 2024. The requested answers come back · reference 3
- One page · Section 8 · Questions that returned · reference 1
- One page · Section 8 · Questions that returned · reference 2
- One page · Section 11 · Not every delay is the same · reference 1
- One page · Section 11 · Not every delay is the same · reference 2
- One page · Section 11 · Not every delay is the same · reference 3
- One page · Section 12 · Where that leaves Pasadena
17. City of Pasadena, Colorado Bridge Safety presentation, April 18, 2018, PDF p. 29, evaluation matrix. Horizontal netting scored relatively high on effectiveness and poorly on aesthetics and emergency-services impact.
Return to passage ↑18. City of Pasadena Public Safety Committee, July 17, 2024, official minutes and official meeting recording. The July 2024 staff report, p. 8 (packet PDF p. 25), proposes further design work, public feedback, and commission review before an early-2025 return. Jones’s support for pursuing a design and returning with a plan appears in the City-hosted captions at approximately 01:18:55–01:19:30. This passage was manually checked against the official recording. Fire Chief Chad Augustin’s rescue and scene-safety discussion begins at approximately 00:34:00, his ladder-truck and resource discussion at 00:34:35, and his statement that he could not recommend horizontal netting from a public-safety standpoint at 00:35:48. Markarian’s unanimous stakeholder conclusion begins at 00:51:03. Madison’s leadership prelude begins at 01:06:24, his question about “all the feasible options” at 01:06:35, and Markarian’s answer at 01:06:45. The quoted wording and these locators were manually checked against the official recording on September 22, 2026. The 01:06:45 locator marks the start of her answer. Her introductory account and the Golden Gate comparison are paraphrased. Madison’s multilayer-netting proposal begins at 01:11:27. Gordo’s remote-intervention technology proposal begins at 01:14:21. Jones’s 24/7-patrol question begins at 01:16:54, his expert-review question at 01:18:41, and staff’s unanimous-answer statement at 01:18:50. The October 3, 2026 addition about Bonnie Tang draws on the official minutes, p. 2, which record her testimony and the committee’s response.
Return to passage ↑Passages citing this source
- Section 7 · 2024. The requested answers come back · reference 1
- Section 7 · 2024. The requested answers come back · reference 2
- Section 7 · 2024. The requested answers come back · reference 3
- Section 7 · 2024. The requested answers come back · reference 4
- Section 7 · 2024. The requested answers come back · reference 5
- Section 7 · 2024. The requested answers come back · reference 6
- Section 7 · 2024. The requested answers come back · reference 7
- Section 7 · 2024. The requested answers come back · reference 8
- Section 7 · 2024. The requested answers come back · reference 9
- Section 8 · Questions that returned · reference 1
- Section 8 · Questions that returned · reference 2
- Section 8 · Questions that returned · reference 3
- Section 8 · Questions that returned · reference 4
- Section 8 · Questions that returned · reference 5
- Section 8 · Questions that returned · reference 6
- Section 8 · Questions that returned · reference 7
- Section 9 · 2025–2026. The schedule moves again
- Section 10 · How the forecasts changed
- Section 11 · Not every delay is the same · reference 1
- Section 11 · Not every delay is the same · reference 2
- Section 11 · Not every delay is the same · reference 3
- One page · Section 7 · 2024. The requested answers come back · reference 1
- One page · Section 7 · 2024. The requested answers come back · reference 2
- One page · Section 7 · 2024. The requested answers come back · reference 3
- One page · Section 7 · 2024. The requested answers come back · reference 4
- One page · Section 7 · 2024. The requested answers come back · reference 5
- One page · Section 7 · 2024. The requested answers come back · reference 6
- One page · Section 7 · 2024. The requested answers come back · reference 7
- One page · Section 7 · 2024. The requested answers come back · reference 8
- One page · Section 7 · 2024. The requested answers come back · reference 9
- One page · Section 8 · Questions that returned · reference 1
- One page · Section 8 · Questions that returned · reference 2
- One page · Section 8 · Questions that returned · reference 3
- One page · Section 8 · Questions that returned · reference 4
- One page · Section 8 · Questions that returned · reference 5
- One page · Section 8 · Questions that returned · reference 6
- One page · Section 8 · Questions that returned · reference 7
- One page · Section 9 · 2025–2026. The schedule moves again
- One page · Section 10 · How the forecasts changed
- One page · Section 11 · Not every delay is the same · reference 1
- One page · Section 11 · Not every delay is the same · reference 2
- One page · Section 11 · Not every delay is the same · reference 3
19. City of Pasadena Public Safety Committee presentation and official meeting recording, July 17, 2024. The survey introduction begins at approximately 00:12:15, Markarian’s explanation of the survey takeaway at 00:12:31, and her “additional education” comment at 00:13:01. Sandri Kramer’s first-responder well-being discussion begins at 00:42:08, and her “public education issue” statement at 00:42:41. The presentation reports 678 responses, 90% Pasadena residents, 74% who had not participated in project community meetings, 57% No and 43% Yes on whether a vertical barrier was needed, and 40% Yes, 33% No, and 27% Don’t Know on whether a vertical barrier would help prevent suicides. Slides 42–45 identify Kramer and present the mental-health discussion. Slide 43 explains how restricting access creates time for risk to diminish or intervention, crediting Harvard T.H. Chan School of Public Health, Means Matter, “Duration of Suicidal Crises.” See also Eberhard A. Deisenhammer et al., “The Duration of the Suicidal Process: How Much Time Is Left for Intervention Between Consideration and Accomplishment of a Suicide Attempt?” Journal of Clinical Psychiatry 70, no. 1, 2009, 19–24. Its interviews concern hospital-treated survivors and do not establish how long every suicidal crisis lasts. The overall survey response count is not used here as a confirmed denominator for each question. Presentation p. 18 notes that some participants did not rank the designs. Presentation p. 16 records the commission’s design ranking and unanimous lighting support; p. 18 reports metal pickets ranked highest and 81% support for lighting. These pages were rechecked September 22, 2026; the per-question denominator limit remains.
Return to passage ↑Passages citing this source
- Section 2 · 2017–2018. An emergency response to an old problem · reference 1
- Section 2 · 2017–2018. An emergency response to an old problem · reference 2
- Section 7 · 2024. The requested answers come back · reference 1
- Section 7 · 2024. The requested answers come back · reference 2
- Section 7 · 2024. The requested answers come back · reference 3
- Section 7 · 2024. The requested answers come back · reference 4
- Section 8 · Questions that returned
- Section 11 · Not every delay is the same
- One page · Section 2 · 2017–2018. An emergency response to an old problem · reference 1
- One page · Section 2 · 2017–2018. An emergency response to an old problem · reference 2
- One page · Section 7 · 2024. The requested answers come back · reference 1
- One page · Section 7 · 2024. The requested answers come back · reference 2
- One page · Section 7 · 2024. The requested answers come back · reference 3
- One page · Section 7 · 2024. The requested answers come back · reference 4
- One page · Section 8 · Questions that returned
- One page · Section 11 · Not every delay is the same
20. City of Pasadena Public Safety Committee official minutes and official meeting recording, July 17, 2024. The minutes, p. 2, record Hampton’s push for faster action and support for vertical mesh. On the recording, his request for a return in approximately 90 days begins at 00:58:57, his vertical-mesh preference at 00:59:36, and his camera and motion-detection proposal at 01:00:30.
Return to passage ↑Passages citing this source
- Section 7 · 2024. The requested answers come back · reference 1
- Section 7 · 2024. The requested answers come back · reference 2
- Section 8 · Questions that returned · reference 1
- Section 8 · Questions that returned · reference 2
- Section 11 · Not every delay is the same
- One page · Section 7 · 2024. The requested answers come back · reference 1
- One page · Section 7 · 2024. The requested answers come back · reference 2
- One page · Section 8 · Questions that returned · reference 1
- One page · Section 8 · Questions that returned · reference 2
- One page · Section 11 · Not every delay is the same
21. City of Pasadena Public Safety Committee, July 17, 2024, official meeting recording. Hampton’s return to horizontal netting and continuous patrol begins at approximately 01:19:40. His first rescue-cushion question begins at 01:20:04, his higher-capacity question and continued netting discussion at 01:20:55, and his statement that horizontal netting should not be eliminated at 01:21:29. The same sequence contains Fire’s explanation that Pasadena’s cushion was rated for roughly 100 feet, while portions of the bridge reach roughly 150 feet and the equipment cannot be positioned everywhere below the bridge. A later Fire Department presentation in the May 20, 2026 committee packet, PDF p. 22 (slide 2), lists a rescue cushion among response resources but supplies no height rating. It does not document acquisition of a higher-capacity cushion or an answer to the 2024 request. The discussion sequence was checked against the City-hosted captions on October 2, 2026.
Return to passage ↑Passages citing this source
- Section 7 · 2024. The requested answers come back · reference 1
- Section 7 · 2024. The requested answers come back · reference 2
- Section 7 · 2024. The requested answers come back · reference 3
- Section 11 · Not every delay is the same
- One page · Section 7 · 2024. The requested answers come back · reference 1
- One page · Section 7 · 2024. The requested answers come back · reference 2
- One page · Section 7 · 2024. The requested answers come back · reference 3
- One page · Section 11 · Not every delay is the same
22. City of Pasadena Public Safety Committee, July 17, 2024, official meeting recording. Madison’s statement that the City had to elevate human life and human safety over objects begins at approximately 01:03:10.
Return to passage ↑23. Matthew Segal, “The Complicated Case of the Colorado Street Bridge,” Los Angeles magazine, June 18, 2018, interviews Sue Mossman about protecting people while respecting the bridge’s architectural and historic value. It is not cited here for later structural, maintenance, or rescue findings. Sue Mossman, “Observe the three A’s and P’s for critical preservation issues,” West Pasadena Residents’ Association, The News, Winter 2026, p. 8, supplies the later reflections that the barrier process took much longer than anticipated and that no solution will be perfect.
Return to passage ↑24. City of Pasadena Public Safety Committee, August 18, 2021 official recording, approximately 00:14:14–00:14:32. Staff attributed delayed material procurement and mockup fabrication to the pandemic. I checked Markarian’s wording against the official recording after checking the City-hosted captions and a transcript of the recording. The City’s February 22, 2023 community-outreach presentation, PDF p. 30, records receipt of responses to a second RFP round. The City Manager’s Weekly Newsletter, February 9, 2023, PDF p. 2, reports that the first RFP received no proposals and that Public Works issued it a second time. The underlying solicitation and procurement file have not been independently reviewed. For the design reset and separate construction-funding requirement, see Sources 4 and 28.
Return to passage ↑Passages citing this source
- Section 5 · 2022. The first design cycle resets
- Section 11 · Not every delay is the same · reference 1
- Section 11 · Not every delay is the same · reference 2
- One page · Section 5 · 2022. The first design cycle resets
- One page · Section 11 · Not every delay is the same · reference 1
- One page · Section 11 · Not every delay is the same · reference 2
25. City of Pasadena, Office of the City Manager, “Eaton Fire: Active Fire Response Update and Local Assistance Center,” posted January 9 and updated January 10, 2025. The release describes active firefighting, evacuations, planned damage assessments, and assistance centers. The bridge-project records reviewed do not attribute a specific project delay to the fire.
Return to passage ↑Passages citing this source
26. City of Pasadena capital-improvement monitoring records for 2025 and 2026. The FY2025 Q4 report showed test-panel work beginning and still listed a June 30, 2026 target completion date. The FY2026 Q1 report anticipated a final concept recommendation to the Public Safety Committee in Q2 and moved the target completion date to June 30, 2028. The February 23, 2026 FY2026 Q2 report said test-panel construction and review were complete, outreach to the San Rafael Neighborhood Association and Pasadena Heritage had occurred, and West Pasadena Residents’ Association and Public Safety Committee presentations were anticipated in Q3. The FY2026 Q3 report in the May 11, 2026 Finance Committee packet, PDF p. 12, covering activity through March 31, 2026, listed $1,468,155 in life-to-date expenditures, 51% spent, retained the June 30, 2028 completion date, and moved the anticipated Public Safety presentation to Q4. The FY2026 Q4 report, covering activity through June 30, 2026 and included in the August 24, 2026 Finance/Audit Committee packet, listed $2,874,000 appropriated, $1,475,508 in life-to-date expenditures, 51% spent, and retained the June 30, 2028 completion date. On packet PDF page 184 (report p. 4), the row identifies project 73324 as “Colorado Street Bridge Barrier Enhancements - Design Phase,” lists its phase as “Ongoing,” and reports that further evaluation of concepts by Pasadena Heritage continued in the fourth quarter. The Q4 row did not list a Public Safety presentation as an anticipated milestone. These dates apply to the design-phase project.
Return to passage ↑Passages citing this source
- Section 9 · 2025–2026. The schedule moves again · reference 1
- Section 9 · 2025–2026. The schedule moves again · reference 2
- Section 9 · 2025–2026. The schedule moves again · reference 3
- Section 9 · 2025–2026. The schedule moves again · reference 4
- Section 9 · 2025–2026. The schedule moves again · reference 5
- Section 9 · 2025–2026. The schedule moves again · reference 6
- Section 10 · How the forecasts changed · reference 1
- Section 10 · How the forecasts changed · reference 2
- Section 10 · How the forecasts changed · reference 3
- Section 10 · How the forecasts changed · reference 4
- Section 10 · How the forecasts changed · reference 5
- Section 10 · How the forecasts changed · reference 6
- Section 10 · How the forecasts changed · reference 7
- Section 10 · How the forecasts changed · reference 8
- Section 10 · How the forecasts changed · reference 9
- One page · Section 9 · 2025–2026. The schedule moves again · reference 1
- One page · Section 9 · 2025–2026. The schedule moves again · reference 2
- One page · Section 9 · 2025–2026. The schedule moves again · reference 3
- One page · Section 9 · 2025–2026. The schedule moves again · reference 4
- One page · Section 9 · 2025–2026. The schedule moves again · reference 5
- One page · Section 9 · 2025–2026. The schedule moves again · reference 6
- One page · Section 10 · How the forecasts changed · reference 1
- One page · Section 10 · How the forecasts changed · reference 2
- One page · Section 10 · How the forecasts changed · reference 3
- One page · Section 10 · How the forecasts changed · reference 4
- One page · Section 10 · How the forecasts changed · reference 5
- One page · Section 10 · How the forecasts changed · reference 6
- One page · Section 10 · How the forecasts changed · reference 7
- One page · Section 10 · How the forecasts changed · reference 8
- One page · Section 10 · How the forecasts changed · reference 9
27. City of Pasadena Public Safety Committee roster and August 19, 2026 cancellation notice. Vice Mayor Jess Rivas is chair, with Tyron Hampton, Justin Jones, and Steve Madison as members. The notice establishes a committee cancellation, not that a bridge item had been scheduled or that a bridge decision was postponed.
Return to passage ↑28. City of Pasadena Public Works, Colorado Street Bridge project page, checked October 5, 2026. The page continued to state that the fencing installed in September 2018, approximately 10 feet high, remains in place as a temporary measure while the City seeks a permanent, historically compatible deterrent. The page also states that the design phase is funded while construction funding remains to be identified.
Return to passage ↑Passages citing this source
- Section 2 · 2017–2018. An emergency response to an old problem · reference 1
- Section 2 · 2017–2018. An emergency response to an old problem · reference 2
- Section 2 · 2017–2018. An emergency response to an old problem · reference 3
- Section 9 · 2025–2026. The schedule moves again · reference 1
- Section 9 · 2025–2026. The schedule moves again · reference 2
- Section 10 · How the forecasts changed
- Section 11 · Not every delay is the same
- Section 12 · Where that leaves Pasadena · reference 1
- Section 12 · Where that leaves Pasadena · reference 2
- Section 12 · Where that leaves Pasadena · reference 3
- Section 12 · Where that leaves Pasadena · reference 4
- Section 12 · Where that leaves Pasadena · reference 5
- One page · Section 2 · 2017–2018. An emergency response to an old problem · reference 1
- One page · Section 2 · 2017–2018. An emergency response to an old problem · reference 2
- One page · Section 2 · 2017–2018. An emergency response to an old problem · reference 3
- One page · Section 9 · 2025–2026. The schedule moves again · reference 1
- One page · Section 9 · 2025–2026. The schedule moves again · reference 2
- One page · Section 10 · How the forecasts changed
- One page · Section 11 · Not every delay is the same
- One page · Section 12 · Where that leaves Pasadena · reference 1
- One page · Section 12 · Where that leaves Pasadena · reference 2
- One page · Section 12 · Where that leaves Pasadena · reference 3
- One page · Section 12 · Where that leaves Pasadena · reference 4
- One page · Section 12 · Where that leaves Pasadena · reference 5
29. Annette L. Beautrais, Sheree J. Gibb, David M. Fergusson, L. John Horwood, and Gregory Luke Larkin, “Removing Bridge Barriers Stimulates Suicides, An Unfortunate Natural Experiment,” Australian and New Zealand Journal of Psychiatry 43, no. 6, 2009, 495–497. The 2009 study compared periods with the old barriers in place, after removal, and after improved barriers were restored. An earlier study by Annette L. Beautrais, “Effectiveness of Barriers at Suicide Jumping Sites: A Case Study,” Australian and New Zealand Journal of Psychiatry 35, no. 5, 2001, 557–562, supplies the comparison used in the body. Its Table 1 records three deaths from the bridge during 1992–1995 and 15 during 1997–2000. Its shorter regional comparison did not establish whether removal increased deaths by jumping across the city as a whole. The 2009 follow-up recorded no suicides from the bridge during 2003–2006 after the improved barriers were installed. Georgina R. Cox et al., “Interventions to Reduce Suicides at Suicide Hotspots, A Systematic Review,” BMC Public Health 13, 214, 2013, reports that the Grafton barriers were removed for aesthetic reasons and that the 2003 replacement used an improved curved-glass design. Beautrais et al. record several concerns behind removal, including appearance, effects on the historic structure, and interference with rescue operations. See also Okolie et al., “Means Restriction for the Prevention of Suicide by Jumping,” Cochrane Database of Systematic Reviews, 2020, for the broader evidence on physical barriers at jumping sites. Olive Bennewith, Mike Nowers, and David Gunnell, “Suicidal Behaviour and Suicide from the Clifton Suspension Bridge, Bristol and Surrounding Area in the UK: 1994–2003,” European Journal of Public Health 21, no. 2, 2011, 204–208, reports fewer deaths without fewer incidents after barrier installation. Staff interviews describe increased time to intervene. The site also used cameras and patrols, so the study does not isolate delay as the sole mechanism. The Cochrane review found reductions at intervention sites but rated the evidence low quality because of observational designs and differences between studies.
Return to passage ↑Passages citing this source
- Section 2 · 2017–2018. An emergency response to an old problem
- Section 7 · 2024. The requested answers come back
- Section 12 · Where that leaves Pasadena · reference 1
- Section 12 · Where that leaves Pasadena · reference 2
- One page · Section 2 · 2017–2018. An emergency response to an old problem
- One page · Section 7 · 2024. The requested answers come back
- One page · Section 12 · Where that leaves Pasadena · reference 1
- One page · Section 12 · Where that leaves Pasadena · reference 2
30. These studies provide context for the body’s discussion of whether restricting access at one site shifts deaths elsewhere. The 2025 review postdates Madison’s 2021 remarks. Mark Sinyor and Anthony J. Levitt, “Effect of a Barrier at Bloor Street Viaduct on Suicide Rates in Toronto, Natural Experiment,” BMJ 341, 2010, c2884, initially found that while the barrier eliminated deaths at the viaduct during the first four years, deaths from other Toronto bridges increased. Mark Sinyor et al., “Did the Suicide Barrier Work After All? Revisiting the Bloor Viaduct Natural Experiment and Its Impact on Suicide Rates in Toronto,” BMJ Open 7, 2017, e015299, extended the comparison to 11 years after installation and found that the earlier increase at other bridges did not persist, bridge deaths across Toronto declined significantly, and there was no associated increase in suicide by other means. Lay San Too et al., “Impact of Interventions at Frequently Used Suicide Locations on Occurrence of Suicides at Other Sites: A Systematic Review and Meta-analysis,” Psychological Medicine 55, 2025, e168, reviewed 17 studies and found no clear increase at other sites after means restriction, alongside fewer deaths using the same method overall. The authors note limited nearby-site data and uncertainty for sites of different or unspecified types. Their analysis did not detect a reduction in suicides from all methods combined.
Return to passage ↑Passages citing this source
31. City of Pasadena, special joint Finance Committee and City Council meeting, April 20, 2026, official Finance Committee recording and approved meeting minutes. Acting City Manager Matt Hawkesworth’s bridge-funding passage begins at approximately 00:08:10. Public Works Director Greg de Vinck’s $4.5 million application and matching-funds passage begins at 00:09:15. Councilmember Rick Cole’s cost-and-completion questioning begins at 01:59:13. City Engineer Brent Maue then gives a ballpark of $1.5 million spent and about $1.3 million remaining. His clarification that the remaining balance would finish design rather than construction begins at 02:00:24, his construction estimate of roughly $4 million at 02:00:54, and his second reference to the $4.5 million federal shortlist at 02:01:11. The approved minutes independently summarize Cole as asking about project status, costs to date, and whether sufficient funding was available for completion. The remaining-balance estimate differs from the balance implied by the appropriation and expenditure figures in Source 26, and the records do not reconcile the difference. The April discussion used both “earmark” and “grant application” without identifying the funding program. The available record does not establish whether the $4.5 million figure referred to the Community Project Funding request published by Rep. Chu. The companion guide groups the April 20 exchanges with their context and source links.
Return to passage ↑Passages citing this source
- Section 9 · 2025–2026. The schedule moves again · reference 1
- Section 9 · 2025–2026. The schedule moves again · reference 2
- Section 9 · 2025–2026. The schedule moves again · reference 3
- Section 9 · 2025–2026. The schedule moves again · reference 4
- Section 12 · Where that leaves Pasadena
- One page · Section 9 · 2025–2026. The schedule moves again · reference 1
- One page · Section 9 · 2025–2026. The schedule moves again · reference 2
- One page · Section 9 · 2025–2026. The schedule moves again · reference 3
- One page · Section 9 · 2025–2026. The schedule moves again · reference 4
- One page · Section 12 · Where that leaves Pasadena
32. Malcolm Gladwell, Talking to Strangers, 2019, chapter 10. Madison identified this general-audience book as the source of his discussion of coupling. Gladwell’s account draws on peer-reviewed work including Ronald V. Clarke and Pat Mayhew, “The British Gas Suicide Story and Its Criminological Implications,” Crime and Justice 10, 1988, 79–116, and Richard H. Seiden, “Where Are They Now? A Follow-up Study of Suicide Attempters from the Golden Gate Bridge,” Suicide and Life-Threatening Behavior 8, no. 4, 1978, 203–216. The book is cited as the source Madison recalled, not as a peer-reviewed suicide-prevention study. Seiden’s bridge cohort comprised 515 people restrained before jumping, rather than survivors of falls. These groups should not be conflated with the documentary accounts Madison recalled in November 2023. The study supports examining whether an interrupted attempt is inevitably followed by death elsewhere.
Return to passage ↑Passages citing this source
33. City of Pasadena Design Commission, January 9, 2024, official meeting recording, staff memorandum, agenda, and approved minutes, together with the City’s 2019 preservation record for the Colorado Street Bridge Barrier Enhancements advisory review. The approved minutes, p. 2, record no consensus on a design and requests for further study of metal pickets, the angle and details of canted webmesh, and a possible combination of the materials. Delgado raises the Golden Gate Bridge, horizontal netting, and landscaping at approximately 00:41:27. An unidentified off-camera respondent discusses netting at 00:42:33, the effectiveness of vertical barriers at approximately 00:43:59, Donald MacDonald Architects at 00:44:41, and the Council’s direction at 00:45:50. The effectiveness wording was manually checked against the official recording. The same voice was heard across these four responses, and participants directed their attention toward the same off-camera location. The speaker’s name and role could not be established. Delgado’s statement about “a previous City Council and a long time ago” begins at 00:45:34. A commissioner discusses the bridges’ structural differences at 00:46:21. Delgado’s cacti suggestion begins at 00:47:03 and her apartment-building account at 00:47:13. An off-camera speaker responds about existing bungalows at 00:47:29 and bridge-deck safety at approximately 00:47:50. The 00:46:21 speaker was seated with the commission. The 00:47:29 respondent was off camera. Neither was identified by name or verified as staff or a consultant. Delgado’s rejection of all three designs begins at 01:06:28. The agenda and minutes name Tiffiny Chen, Senior Project Manager in Public Works, as the presenter, but do not identify these respondents.
Return to passage ↑Passages citing this source
- Section 7 · 2024. The requested answers come back · reference 1
- Section 7 · 2024. The requested answers come back · reference 2
- Section 7 · 2024. The requested answers come back · reference 3
- Section 7 · 2024. The requested answers come back · reference 4
- Section 7 · 2024. The requested answers come back · reference 5
- Section 8 · Questions that returned · reference 1
- Section 8 · Questions that returned · reference 2
- One page · Section 7 · 2024. The requested answers come back · reference 1
- One page · Section 7 · 2024. The requested answers come back · reference 2
- One page · Section 7 · 2024. The requested answers come back · reference 3
- One page · Section 7 · 2024. The requested answers come back · reference 4
- One page · Section 7 · 2024. The requested answers come back · reference 5
- One page · Section 8 · Questions that returned · reference 1
- One page · Section 8 · Questions that returned · reference 2
34. Rep. Judy Chu, “Appropriations & Community Project Funding Requests,” FY2027 project disclosure page, checked September 10, 2026. The page lists the Colorado Street Bridge Barrier Enhancements project, the City of Pasadena as sponsor, and a requested amount of $4,000,000. U.S. House of Representatives, Committee on Appropriations, House Report 119-686 to accompany H.R. 9170, Transportation, Housing and Urban Development, and Related Agencies Appropriations Bill, 2027, dated June 5, 2026, printed p. 203 (PDF p. 207), lists a House amount of $1,000,000. The City project page continued to state that design was funded while construction funding had not been identified. A federal award or obligation to Pasadena remains unconfirmed in these records.
Return to passage ↑Passages citing this source
35. Joe Piasecki, “Pasadena seeks to curb suicides at Colorado Street Bridge with messages of hope,” Glendale News-Press, June 21, 2013, and Steve Lauria, “When Angels Saved Her: Only Known Survivor of ‘Suicide Bridge’ Relives the Fateful Day,” Los Angeles Times, November 26, 1992. The 2013 account says Pasadena moved slowly amid concerns about how safety measures would affect the bridge’s appearance and describes the 1937 barrier as a 7½-foot woven-steel fence. The 2019 historical-resource report cited in Source 36 calls it chain-link. The text uses the broader term “mesh fence.” The 1992 account describes barbed wire along the top of the fence, while the draft historical-resource report calls it razor wire on printed p. 16. The body and Figure 3 caption follow the newspaper’s wording. The 1992 account reports no deaths by suicide during the first two years after installation. It also reports that deaths later resumed, but that, as of 1992, no single year had again reached the levels recorded during the 1930s. Contemporary references in the Eagle Rock Sentinel, January 24, 1936, and the Santa Ana Journal, January 4, 1937, show that the nickname was in public use by 1936, but they do not establish when it began.
Return to passage ↑Passages citing this source
- Section 1 · The bridge and its history
- Section 2 · 2017–2018. An emergency response to an old problem · reference 1
- Section 2 · 2017–2018. An emergency response to an old problem · reference 2
- One page · Section 1 · The bridge and its history
- One page · Section 2 · 2017–2018. An emergency response to an old problem · reference 1
- One page · Section 2 · 2017–2018. An emergency response to an old problem · reference 2
36. GPA Consulting, Historical Resource Technical Report, Colorado Street Bridge, draft, November 2019, pp. 15–20, and Vicki Torres, “Fixing Bridges, Pasadena Restores Links to Past,” Los Angeles Times, September 3, 1989. The historical-resource report says the 1937 barrier was replaced sometime between 1937 and 1956 by iron railings that curved toward the sidewalk, and that installing the second barrier removed the original balustrade and refuge bays. It says the 1993 seismic rehabilitation reconstructed the balustrade, refuge bays, cornice, brackets, and lighting features. The text describes that work as an earthquake retrofit for clarity. The Torres article said the project would revamp the safety railing then in place to produce less of a “tunnel effect.” The City’s July 2017 presentation, Source 2, identified all 20 alcoves and both ends of the bridge as places where people could climb over or get around the post-restoration barrier.
Return to passage ↑Passages citing this source
- Section 1 · The bridge and its history
- Section 2 · 2017–2018. An emergency response to an old problem · reference 1
- Section 2 · 2017–2018. An emergency response to an old problem · reference 2
- Section 2 · 2017–2018. An emergency response to an old problem · reference 3
- One page · Section 1 · The bridge and its history
- One page · Section 2 · 2017–2018. An emergency response to an old problem · reference 1
- One page · Section 2 · 2017–2018. An emergency response to an old problem · reference 2
- One page · Section 2 · 2017–2018. An emergency response to an old problem · reference 3
37. City of Pasadena, Office of the City Manager, “Weekly Newsletter - Jul 17, 2025,” section “Ride Pasadena Transit Route 10 to the Pasadena Heritage Bridge Party.” The newsletter dates the Bridge Party tradition to 1978 and describes it as a celebration of the bridge and the efforts to preserve it.
Return to passage ↑Passages citing this source
38. American Film Institute, AFI Catalog of Feature Films, The Kid (1921), History section. The location discussion identifies Pasadena’s Colorado Street Bridge as the setting for Edna’s contemplation of suicide and cites John Bengtson’s location research in Silent Traces (2006).
Return to passage ↑Passages citing this source
39. Visit Pasadena, “Colorado Street Bridge,” directory entry, Overview section. The entry identifies the bridge’s appearance in La La Land (2016).
Return to passage ↑Passages citing this source
40. Cox et al., “Interventions to Reduce Suicides at Suicide Hotspots” (2013, full citation in Source 29), Background section. The review defines hotspots. Vienna C. Lam, J. Bryan Kinney, and Lynne S. Bell, “Geospatial Analysis of Suicidal Bridge Jumping in the Metro Vancouver Regional District from 2006 to 2014,” Journal of Forensic and Legal Medicine 47, 2017, 1–8, Methods and Discussion sections. The analysis of 145 bridge deaths compared home addresses with bridge locations. The authors suggest that the meaning associated with prominent bridges may help explain the pattern. Distances were estimated from possible routes, not verified individual journeys. The study does not directly establish people’s motives or whether the same pattern applies in Pasadena.
Return to passage ↑Passages citing this source
41. City of Pasadena, FY2023 adopted capital budget, project 73324, PDF p. 8; June 9, 2025 staff report, p. 2; June 9 approved Council minutes, pp. 4 and 6; July 21, 2025 staff report, pp. 2–4; July 21 approved Council minutes, pp. 8–9 and 12. The annual capital budgets and approved Council actions reconcile the net appropriation to $2,874,000. They didn’t establish the available balance after outstanding commitments or the bridge-specific federal ARPA accounting.
Return to passage ↑42. Brad Hanson, Pasadena Beautiful Foundation president, Guest Opinion | Brad Hanson, Pasadena Beautiful: Colorado Street Bridge Barrier Options Impair Views, Degrade Walking Experience, Pasadena Now, April 1, 2021. Guest opinion advocating horizontal netting. Reviewed for the October 3, 2026 additions.
Return to passage ↑Passages citing this source
43. Pasadena Now, Pasadena Heritage Wants Community, Public Works Dept. to Keep Looking for Additional Solutions to Bridge Suicide Barriers Being Considered, May 11, 2021. Reports a letter from Sue Mossman and Andrew Salimian explaining Pasadena Heritage’s objections to the three mockups. The account here draws on the published report. Reviewed October 3, 2026.
Return to passage ↑Passages citing this source
44. West Pasadena Residents’ Association, letter to Mayor Victor Gordo and City Council members, June 8, 2021, pp. 1–2, signed by Dan Beal for the board of directors. The webpage was posted June 19. Both letter pages reviewed October 3, 2026.
Return to passage ↑Passages citing this source
45. Kathleen Clary Miller, Letter to the Editor: Crossing the Arroyo, Memories of the Colorado Bridge, Pasadena Now, August 18, 2021. Personal recollection and support for permanent protection. Reviewed October 3, 2026.
Return to passage ↑Passages citing this source
46. André Coleman, Ahead of Bridge Party, Pasadena Neighborhood Group Urges Action on Colorado Street Bridge Safety Barriers, Pasadena Now, July 16, 2025. Reports the San Rafael Neighborhoods Association’s statement and City Engineer Brent Maue’s response. His summer and fall review sequence was a forecast, with public mockups on the bridge conditional on those reviews. Reviewed October 3, 2026.
Return to passage ↑Passages citing this source
47. City of Pasadena, April 20, 2020 capital-budget staff report, p. 3; Council action recap, item 24; and FY2021–2025 adopted capital budget, Streets and Streetscapes, project 73324, printed p. 2.6 (PDF p. 8). The report removed a planned new $2 million General Fund (Measure I) appropriation from the recommendation. Council approved the recommendation with direction for further reporting on identified projects. The adopted project page retained $950,000 previously appropriated, added no FY2021 funding, and made construction dependent on available funds. Reviewed October 3, 2026.
Return to passage ↑Passages citing this source
48. Nathan Masters, Colorado Street Bridge: The Birth of a Pasadena Landmark, PBS SoCal, November 22, 2013. Historical account and archival photographs covering the earlier Scoville crossing, construction, the opening celebration, and Route 66. The National Park Service history also explains the curved alignment and foundation conditions. The article gives Waddell’s first name as Joseph. The Library of Congress catalog identifies him as John Alexander Low Waddell. Reviewed October 3, 2026.
Return to passage ↑Passages citing this source
- Section 1 · The bridge and its history · reference 1
- Section 1 · The bridge and its history · reference 2
- Section 1 · The bridge and its history · reference 3
- One page · Section 1 · The bridge and its history · reference 1
- One page · Section 1 · The bridge and its history · reference 2
- One page · Section 1 · The bridge and its history · reference 3
49. Eddie Rivera, ‘Open House’ Details Colorado Street Bridge Barrier Options, Pasadena Now, March 26, 2021. Reports the March 25 open house and Steve Line’s explanation of the mesh and picket alternatives. The comparative design claims are attributed to the presentation. Reviewed October 3, 2026.
Return to passage ↑Passages citing this source
50. Keith Calayag, No Consensus, No Approvals of New Colorado Street Bridge Suicide Mitigation Barrier Concepts at Design Commission Meeting, Pasadena Now, January 10, 2024. Reports commissioners’ differing preferences at the January 9 meeting. Source 33 supplies the official minutes and recording for the commission’s advisory outcome. Reviewed October 3, 2026.
Return to passage ↑Illustration sources
Images are reproduced in reduced form for noncommercial reporting, historical analysis, and commentary on the publicly funded Colorado Street Bridge project. Sources and credited creators are identified below.
Figure 1
Color view of the bridge after its 1993 restoration, showing its curve and concrete arches across the Arroyo Seco. The report identifies the view as shortly after the 1993 rehabilitation, but the photograph’s exact date is not stated.
BCA Associates, reproduced in GPA Consulting’s 2019 draft historical-resource report, printed p. 17 (PDF p. 20). Report
Figure 2
Fence and netting proposals, circa 1932. The City’s 2017 presentation included these earlier designs in its historical discussion. These are proposal drawings, not photographs of measures that were installed.
City engineering drawings, reproduced in the July 19, 2017 Public Safety Committee presentation, PDF pp. 3–4. Fencing drawing | Netting drawing
Figure 3
Two earlier barriers. Left, the mesh fence topped with barbed wire in 1937. Right, an enlarged detail of the inward-curving iron railing in 1988, before the historic concrete railing and seating alcoves were reconstructed in 1993.
Left, Los Angeles Public Library, Herald Examiner Collection, order no. 00099441. Right, Tavo Olmos, Historic American Engineering Record, CA-58-13. Both reproduced in GPA Consulting’s 2019 draft report, printed pp. 16 and 19 (PDF pp. 19 and 22). For the differing descriptions of the 1937 fence and its wire topping, see Source 35. The HAER photo index identifies Olmos and dates the photographs to June 1988. 1937 record | Historical report | HAER photo index
Figure 4
Left, an enlarged detail of a restored seating alcove before fencing. Right, temporary fencing at an alcove. The photograph dates are not stated.
City of Pasadena task-force presentation, April 18, 2018. PDF p. 9 supplies the open-alcove photograph. PDF p. 12 reports completion of the alcove fencing on July 24, 2017. PDF p. 13 supplies the installed-fence photograph. Open alcove | Completion date | Installed fencing
Figure 5
The full-length temporary chain-link fence along both sides of the bridge. This photograph appears in the City’s November 2019 presentation. The presentation date is not assigned as the photograph’s capture date.
City of Pasadena, Department of Public Works, Historic Preservation Commission presentation, November 19, 2019, PDF p. 2, lower photograph. Reproduced at reduced size for this noncommercial civic paper, with credit to the City. For installation history and height, see Sources 4 and 28. Photograph in presentation | City reuse notice
Figure 6
Full-scale mockups from the first design cycle, 2021. Left to right, Option A, curved-straight mesh, Option B, curved-curved mesh, and Option C, straight-straight pickets. These were physical mockups, not permanent installations. The red supports were temporary and not part of the proposed designs.
City of Pasadena, Design Commission memorandum, May 11, 2021. PDF p. 2 identifies the options. PDF pp. 6, 8, and 10 supply the photographs and explain the red supports. Design cycle led by Donald MacDonald Architects. Options | Mockup photographs
Figure 7
The three concepts presented in November 2023. Left to right, canted webmesh, vertical webmesh, and metal pickets. These matched-view architectural renderings show proposed appearance, not built conditions or proof of comparative safety.
Apexx Architecture concepts, City of Pasadena Public Works presentation, November 15, 2023. The reproduced images are on PDF pp. 18, 28, and 23, in that order. Source 13 separately cites materials on pp. 14–15 and the webmesh concepts on pp. 18 and 28. Canted webmesh | Vertical webmesh | Metal pickets. The July 2024 narrowing is documented in the July 17, 2024 presentation, p. 16. The committee’s disposition is discussed in Sources 18, 20, and 21.
Figure 8
Horizontal-netting concepts shown to the Public Safety Committee in 2017 (top) and 2024 (bottom). These are renderings of proposed systems, not installed conditions. The dates identify the presentations, not construction or installation.
Top, City of Pasadena, Public Safety Committee presentation, July 19, 2017, slide 37, “Alt. 4: Safety Netting.” Bottom, City of Pasadena, Department of Public Works, Colorado Street Bridge Barrier Enhancements Project Update, July 17, 2024, slide 24, “Horizontal Barrier Preliminary Options,” Option 1. Each image is cropped from its presentation slide, with the displayed proportions preserved. 2017 netting concept | 2024 preliminary Option 1