Colorado Street BridgeAlternatives studied

Horizontal netting

Follow Pasadena’s review of horizontal netting, including engineering, rescue, and preservation concerns.

Netting was considered more than once

Pasadena’s reviewers recommended against a net at this bridge because of engineering, appearance, and rescue concerns. Some engineering work remained preliminary.

2017–2018

Netting was part of the original comparison

The City presented a safety-netting concept in 2017. The 2018 task-force comparison rated horizontal netting relatively highly for effectiveness, but poorly for appearance and its effect on emergency services.

Read the supporting record
More supporting records
Nov 2023

The question returned with new vertical designs

Councilmember Steve Madison asked about horizontal netting and landscaping. Staff said both had been studied and described difficulties involving the bridge’s geometry, structural demands, remaining fall distance, and the appearance of a net beneath its arches.

Read the supporting record
Jan 2024

The Design Commission revisited the alternative

Chair Julianna Delgado asked whether a horizontal net or another measure could be used. An off-camera respondent described the earlier review and the Council’s vertical-barrier direction. The records reviewed do not identify that speaker by name or role.

Read the supporting record

Findings and limits

The 2024 engineering work was unfinished. Engineers had not designed the connections, and more study was needed to determine whether the bridge itself would need changes.